Transmission Schemes

Transmission Schemes
 
Sr.No. Title of the scheme Description about Scheme
1

Various Transmission Schemes (other than potential REZ schemes) under ISTS were approved in 3rd meeting of Western Regional Power Committee (Transmission Planning) [WRPC(TP)] held on 14.06.2021. The details of the Transmission System, its justification, estimated cost, study considerations, time-frame/phasing, approval details etc. are provided at https://www.ctuil.in/u/default.aspx (copy attached) for stakeholders (Generators, STUs, RLDCs, SLDC & Distribution Licensees) observations, if any, latest by 01.11.2021 at mail ids psdas[at]ctuil[dot]in,   pratyush.singh[at]ctuil[dot]in

2

Transmission System for Evacuation of Power from potential renewable energy zone in Khavda area of Gujarat (15GW) was discussed and agreed in the 3rd WRPC (TP) meeting held on 14.06.2021. The details of the Transmission System, its justification, estimated cost and its tariff impact, results of the system studies, study assumptions, approval details etc. are provided at https://www.ctuil.in/u/default.aspx (copy attached) for stakeholders (Generators, STUs, RLDCs, SLDC & Distribution Licensees) observations, if any, latest by 03.10.2021 at mail ids psdas[at]ctuil[dot]in pratyush[dot]singh[at]ctuil.in

3

Transmission System for Evacuation of power from Neemuch Solar Energy Zone (SEZ) in Madhya Pradesh was discussed and agreed in the 3rd WRPC (TP) meeting held on 14.06.2021. The details of the Transmission System, its justification, estimated cost and its tariff impact, results of the system studies, study assumptions, approval details etc. are provided at https://www.ctuil.in/u/default.aspx (copy attached) for stakeholders (Generators, STUs, RLDCs, SLDC & Distribution Licensees) observations, if any, latest by 19.09.2021 at mail ids psdas[at]powergrid[dot]in, pratyush[dot]singh[at]powergrid[dot]in

4

Transmission System for Evacuation of power from Luhri St-I HEP(210 MW) was discussed, finalized in consultation with CEA, various state utilities in NR as well as SJVNL.  The system was discussed and agreed in 2nd meeting of NRSCT held on 13/11/2018, the 3rd meeting of NRSCT held on 24/05/2019, 3rd meeting of NRPC(TP) held on 19/02/2021 and 48th NRPC meeting held on 02/09/2020. In view of above, details of the scheme, justification, estimated cost and its tariff impact, results of the system studies, study assumptions, stakeholder  consultation/approval details etc. are provided at https://www.ctuil.in/ for stakeholders(Generators, STUs, RLDCs, SLDC & Distribution Licensees) observations, if any, latest by 16.08.2021 at kashish[at]powergrid[dot]in,sandeepk[at]powergrid[dot]in & sandeepkumawat6[at]gmail[dot]com

5

The transmission system for Evacuation of power from additional 20GW REZ in Rajasthan was discussed in 2nd meeting of NRPC (TP) held on 01/09/2020. Subsequently system was deliberated and approved in 3rd meeting of NRPC(TP) held on 19/02/2021.  In view of above, details of the scheme, justification, estimated cost and its tariff impact, results of the system studies, study assumptions, stakeholder consultation/approval details etc. are provided at https://www.ctuil.in/ for stakeholders(Generators, STUs, RLDCs, SLDC & Distribution Licensees) observations, if any, latest by 30.07.2021 at sandeepk[at]powergrid[dot]in,   kashish[at]powergrid[dot]in and sandeepkumawat6[at]gmail[dot]com

6

Installation of 125 MVAR, 420 kV Bus Reactor at Kala Amb Substation (ISTS) was discussed, finalized in consultation with CEA and state utilities in NR. The system was agreed and approved in 39th meeting of Standing Committee on Power System Planning of Northern Region held on 29-30th May, 2017, 2nd Meeting of Northern Region Standing Committee on Transmission held on 13/11/2018, 40th Northern Region Power Committee (NRPC) meeting held on 28/10/2017 & 3rd Empowered Committee on Transmission (ECT) held on 21/12/2018.The details of the scheme, its justification, estimated cost, stakeholder consultation/approval details etc. are enclosed for information, please.

7

400kV connectivity to Surajmaninagar (TSECL) 400/132kV S/s” was discussed and agreed in the 1st meeting of NERPC(TP) held on 08-11-2019 and 3rd meeting of reconstituted NCT held on 26th and 28th May 2020. This scheme is being implemented as “NERSS-XIV” Scheme. In view of above, details of the scheme, justification, estimated cost and its tariff impact, results of the system studies, study assumptions, stakeholder  consultation / approval details etc. are provided at https://www.ctuil.in/ for stakeholders (Generators, STUs, RLDCs, SLDC & Distribution Licensees) observations, if any, latest by 15.05.2021 at rajeshkumar[at]powergridindia[dot]com, i.anupamk[at]powergridindia[dot]com

8

Establishment of new 220/132kV, 2x160MVA substation at Nangalbibra alongwith associated transmission system was discussed and agreed in the 1st meeting of NERPCTP held on 08-11-2019 and 3rd meeting of reconstituted NCT held on 26th and 28th May 2020. The details of the scheme, its justification, estimated cost, results of the system studies, study assumptions, stakeholder consultation/approval details etc. are enclosed for information, please.

9

Transmission System for Evacuation of power from Pakaldul HEP(1000 MW) was discussed, finalized in consultation with CEA, various state utilities in NR as well as CVPPL. The system was agreed and approved in 1st  meeting of NRPC (TP) held on 24/01/2020, 2nd meeting of NRPC (TP) held on 01/09/2020, 3rd meeting of NRPC(TP) held on 19/02/2021, 48th NRPC meeting held on 02/09/2020 and 3rd NCT held on 26th and 28th May, 2020.

In view of above, details of the scheme, justification, estimated cost and its tariff impact, results of the system studies, study assumptions, stakeholder  consultation/approval details etc. are provided at https://www.ctuil.in/ for stakeholders(Generators, STUs, RLDCs, SLDC & Distribution Licensees) observations, if any, latest by 26.04.2021 at kashish[at]powergridindia[dot]com, sandeepk[at]powergridindia[dot]com

Regulatory approval Petition

10

Transmission System for Evacuation of power from potential Solar Energy Zone (SEZ) in Madhya Pradesh (Chhatarpur & Neemuch Solar Parks) was discussed and agreed in the 2nd WRPC (TP) meeting held on 04.09.2020. During the meeting, Transmission System for Rajgarh SEZ (2500MW), Regulatory Approval for which has already been obtained, was also agreed to be phased out with minor modifications in the scope. The details of the Transmission System for Evacuation of power from potential Solar Energy Zone (SEZ) in Madhya Pradesh (Chhatarpur & Neemuch Solar Parks), its justification, estimated cost and its tariff impact, results of the system studies, study assumptions, approval details etc. are attached for your observations, if any, latest by 10.01.2021 at mail ids psdas[at]powergridindia[dot]com; pratyush[dot]singh[at]powergridindia[dot]com

Stakeholder consultation on Transmission System for Evacuation of power from potential Solar Energy Zone (SEZ) in Madhya Pradesh (Chhatarpur & Neemuch Solar Parks) (additional atachement)

Displaying 1 to 10 of 21