Loading

Connectivity to be Made Effective

Loading
Sr No Expected date of connectivity/
GNA to be made effective
Region State Substation Application ID Name of Applicant Type of Generation Installed Capacity Deemed GNA
1 31-07-2026 WR Gujarat KPS-3 (Sec-I) 230700014 Sarjan Realities Pvt. Ltd. (SRPL) Hybrid 1100 1100
2 31-10-2026 WR Gujarat KPS-3 (Sec-I) 230700010 NTPC Renewable Energy Limited Solar 1200 1200
3 31-05-2025 WR Gujarat KPS-3 (Sec-II) Adani Green Energy Limited Hybrid 1250 1050
4 31-10-2026 WR Gujarat KPS-3 (Sec-II) 230700013 Sarjan Realities Pvt. Ltd. (SRPL) Hybrid 1250 1250
5 31-10-2026 WR Gujarat KPS-3 (Sec-II) 430700015 NHPC Limited Solar 600 0
6 16-08-2025 WR Gujarat Lakadiya PS 2200000011 AVAADA INCLEAN PRIVATE LIMITED Solar 50 50
7 16-08-2025 WR Gujarat Lakadiya PS 2200000131 AVAADA ENERGY PRIVATE LIMITED Solar 300 300
8 16-08-2025 WR Gujarat Lakadiya PS 2200000200 AVAADA ENERGY PRIVATE LIMITED Solar 200 200
9 30-06-2026 WR Gujarat Lakadiya PS 2200000324 ARCELORMITTAL NIPPON STEEL INDIA LIMITED Hybrid (RHGS) 550 (Wind 250MW+Solar 300MW) 350
10 30-06-2026 WR Gujarat Lakadiya PS 2200000610 SERENTICA RENEWABLES INDIA PRIVATE LIMITED Hybrid (RHGS) 480 (240 MW: Wind 240 MW: Solar) 200
Displaying 1 to 10 of 636